Leva

Greenway expand their Danish joint venture, Viridus Manufacturing A/S, for battery production

549 days ago

2 minutes

In 2019, LEVA-EU member Greenway invested in a new battery pack manufacturing facility, Viridus Manufacturing A/S in Aarhus, Denmark. After 3 years of growth, the site was ready for expansion and doubled production capacity.

From the very start, the manufacturing factory had a focus on sustainability, running with zero net emissions. In order to improve zero-emission measurements, a completely new building was planned and constructed by the Danish Viridus team. The factory’s battery equipment, automation, and production know-how came from the Chinese Greenway team.

In August 2022 the Viridus team moved into the new site and started production. The building is carbon-neutral and packed with sustainable features like a wastewater recycling system, biodiversity gardens, CO2-neutral heat pump, reusable building materials, waste sorting, solar panels, bike charging stations, and a healthy indoor climate.

The Danish battery production is supplied by 100% renewable energy, and electric cars are used for internal transportation. Furthermore, all employees have access to training facilities, healthcare, and a healthy canteen environment.

The new site in Aarhus, Denmark, received a Gold DGNB German Sustainable Building Council certificate for the focus on sustainability and recyclability. Congratulations, Viridus team on fantastic work!

Leva
LEVA EU

View all posts

Campaign success

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Member profile

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.